液壓升降平臺(tái)http://m.kkwl.net/有兩邊四組導(dǎo)軌支撐而起的,常規(guī)情況下導(dǎo)軌的長度要比總的行程高度高于兩米。由于導(dǎo)軌柱高度和重量非常的大,所以很多時(shí)候安裝起來特別的不方便。下面我們介紹一下常規(guī)情況下幾種安裝導(dǎo)軌的方法。
Hydraulic lifting platform has four sets of guide rails on both sides of the support into the sky, the length of the conventional case rail travel than the total height above two meters. Since the guide column height and weight is very
large, so a lot of time to install them particularly inconvenient. Here we introduce the conventional case of several mounting rails approach.
室外安裝液壓升降平臺(tái)http://m.kkwl.net/,由于位置在室外,可以選擇使用吊車進(jìn)行吊裝。吊車把導(dǎo)軌柱豎起再進(jìn)行焊接,這樣就比較方便了。如果室外安裝又沒有辦法進(jìn)入吊車,就需要搭建承重的支架再吊電動(dòng)葫蘆再進(jìn)行安裝。室內(nèi)安裝的話由于情況比較復(fù)雜,如果是常規(guī)的樓板安裝可以選擇使用電動(dòng)葫蘆吊裝。而鋼結(jié)構(gòu)廠房在安裝的時(shí)候一定要先看安裝的位置上空是否有主梁,如果沒有承重的主梁也要考慮搭建。
Outdoor installation of hydraulic lifting platform, the position in the outdoor, you can choose to use the crane hoisting. Rail column erect another crane to be welded, so it is more convenient. If outdoor installation is no way to enter the cable car, we need to build a load-bearing bracket and then lifting hoist before installation. Indoor installation, then the situation is more complicated due, if conventional floor installation can choose to use electric hoist lifting. The steel plant over the position when installed must look at whether there is main beam is installed, if there is no load-bearing structures have to consider the main beam.