1、檢測固定升降機(jī)http://m.kkwl.net/管子的質(zhì)量,要查明固定升降機(jī)鋼管材料、尺度和質(zhì)量是不是符合規(guī)劃規(guī)則;查看固定升降機(jī)管子外觀是不是有嚴(yán)重壓扁或曲折,查看固定升降機(jī)管子內(nèi)外壁表面上是不是有腐蝕表象,外壁是不是有裂紋等缺點(diǎn)。
Quality testing fixed lift tube, to identify a fixed lift steel materials, scale and quality is not consistent with the planning rules; see the fixed lift tube appearance is not a serious crush or tortuous, look at the inner and outer wall surfaces of the pipe is not fixed lift corrosion appearance, the outer wall is not a drawback crack.
2、安裝固定升降機(jī)鋼管管道必須按規(guī)劃圖紙或?qū)嶋H測量合理安置,安裝時對固定升降機(jī)鋼管接頭、法蘭件都要進(jìn)行質(zhì)量檢測,發(fā)現(xiàn)如有缺點(diǎn),接頭、法蘭件都禁止運(yùn)用,應(yīng)替換,并用火油清潔和用氣吹凈。
Mounting lift steel pipes must be reasonable planning drawings or actual measurement placement of fixed lift pipe fittings, flanges, parts quality testing should be carried out during installation, if any shortcomings found, fittings,flanges, prohibit the use of parts should be replaced with Oil and gas blowing clean.
3、固定升降機(jī)http://m.kkwl.net/鋼管安裝時對現(xiàn)已酸洗過的管子要用氣吹凈,對已就位的固定升降機(jī)鋼管液壓閥臺、液壓泵站、主機(jī)、輔機(jī)及有關(guān)部件的方位應(yīng)謹(jǐn)慎丈量、力求精確,對接頭之間曲折部位較多、形狀雜亂的管子要先做一個樣板,然后按尺度或樣板切開管子。
When the pipe is installed on a fixed lift pickled now use gas blow pipe, already in place for fixed steel hydraulic valve lift station, orientation pump stations, main engine and related components should be carefully measured, and strive to accurately of twists and turns between the joint parts are more messy tube shape to do first a model, and then press the scale or template to cut the pipe.